User Log On
GalleryGallery

First Baptist Church of Weston First Baptist Church of Weston

Photo Gallery: Construction Pics (Old) Photo Gallery: Construction Pics (Old)

Construction Pics (Old)
New Heat Ducts in Sanctuary--Shinnston Plumbing
Replaces Steam Heat System.
Viewed 3631 times
Ken & Lynne Head to a CE Meeting
Viewed 3573 times
Brick Repointing--Keystone Waterproofing
Work Begins on the other side of the Church.
Viewed 3524 times
Elevator Entrance 1st Floor--Reliable Builders
The Pit.
Viewed 3588 times
Brick Repointing--Keystone Waterproofing
Side View of Church...Finished with the exception of painting the gutters and windows which will be done after Keystone is finished.
Viewed 3455 times
Elevator Entrance 2nd Floor--Reliable Builders
Classroom Beside Sunday School Office...This will also be the location of the new restrooms
Viewed 3529 times
Brick Repointing--Keystone Waterproofing
Side View of Church...Finished with the exception of painting the gutters and windows which will be done after Keystone is finished.
Viewed 3496 times
Elevator Hallway--Reliable Builders
Future Hallway to Elevator System
Viewed 3506 times
Old Steam Piping Is Removed
In Preparation for Dining Hall Renovations
Viewed 3441 times
Old Steam Piping Is Removed
In Preparation for Dining Hall Renovations
Viewed 3520 times
Black WILL BE GONE!
Viewed 3535 times
Repointing of Brick
Viewed 3532 times
Keystone WaterProofing
Exterior Renovations
Viewed 3432 times
Keystone WaterProofing
Exterior Renovations
Viewed 3411 times
< Previous