User Log On

First Baptist Church of Weston First Baptist Church of Weston

Photo Gallery: Construction Pics (Old) Photo Gallery: Construction Pics (Old)

Construction Pics (Old)
Fellowship Hall Extension 9/6/08
Photo By: Steven A. Gower
Viewed 2878 times
Elevator Ramp Hallway 9/6/08
Photo By: Steven A. Gower
Viewed 2609 times
Inside Classroom 9/6/08
Photo By: Steven A. Gower
Viewed 2488 times
Brick Repointing--Keystone Waterproofing
Looks better in Person.
Viewed 2432 times
Brick Repointing--Keystone Waterproofing
Almost Finished.
Viewed 2324 times
Elevator Ramp--Reliable Builders
Rampway to elevator.
Viewed 2349 times
Heating & Air Units--Shinnston Plumbing
Replaces Steam Heat System and brings A/C to Fellowship Hall.
Viewed 2260 times
Heating & Air Units--Shinnston Plumbing
Replaces Steam Heat System and brings A/C to Fellowship Hall.
Viewed 2262 times
New Air Ducts--Shinnston Plumbing
Kitchen.
Viewed 2306 times
New Air Ducts--Shinnston Plumbing
Fellowship Hall.
Viewed 2322 times
New Air Ducts-Shinnston Plumbing
Fellowship Hall Future Extension
Viewed 2340 times
Elevator Hallway--Reliable Builders
Future Hallway to Elevator System
Viewed 2350 times
New Air Ducts-Shinnston Plumbing
Fellowship Hall Future Extension
Viewed 2354 times
New Heat Ducts in Sanctuary--Shinnston Plumbing
Replaces Steam Heat System.
Viewed 2476 times
New Air Ducts-Shinnston Plumbing
In Fellowship Hall
Viewed 2688 times
< Previous     Next >