User Log On
GalleryGallery

First Baptist Church of Weston First Baptist Church of Weston

Photo Gallery: Construction Pics (Old) Photo Gallery: Construction Pics (Old)

Construction Pics (Old)
Fellowship Hall Extension 9/6/08
Photo By: Steven A. Gower
Viewed 4114 times
Elevator Ramp Hallway 9/6/08
Photo By: Steven A. Gower
Viewed 3765 times
Inside Classroom 9/6/08
Photo By: Steven A. Gower
Viewed 3604 times
Brick Repointing--Keystone Waterproofing
Looks better in Person.
Viewed 3561 times
Brick Repointing--Keystone Waterproofing
Almost Finished.
Viewed 3479 times
Elevator Ramp--Reliable Builders
Rampway to elevator.
Viewed 3480 times
Heating & Air Units--Shinnston Plumbing
Replaces Steam Heat System and brings A/C to Fellowship Hall.
Viewed 3348 times
Heating & Air Units--Shinnston Plumbing
Replaces Steam Heat System and brings A/C to Fellowship Hall.
Viewed 3355 times
New Air Ducts--Shinnston Plumbing
Kitchen.
Viewed 3417 times
New Air Ducts--Shinnston Plumbing
Fellowship Hall.
Viewed 3436 times
New Air Ducts-Shinnston Plumbing
Fellowship Hall Future Extension
Viewed 3440 times
Elevator Hallway--Reliable Builders
Future Hallway to Elevator System
Viewed 3480 times
New Air Ducts-Shinnston Plumbing
Fellowship Hall Future Extension
Viewed 3484 times
New Heat Ducts in Sanctuary--Shinnston Plumbing
Replaces Steam Heat System.
Viewed 3634 times
New Air Ducts-Shinnston Plumbing
In Fellowship Hall
Viewed 3836 times
< Previous     Next >